Voigt Bridge Replacement/ Voigt Drive Widening/ Campus Point Drive Realignment

Anticipated construction start: Late 2018

Voigt Drive and Campus Point Drive will be modified to accommodate the increased traffic that will result from implementation of the future Voigt Direct Access Ramp (DAR) to the I-5 freeway. The Voigt Drive Bridge will be replaced with a wider bridge that includes sidewalks and bike lanes.

Additionally, Voigt Drive will be widened from two to four lanes, starting at the Voigt Drive Bridge and going to Genesee Avenue on the east. This will require relocation of the Campus Point Drive and Voigt Drive intersection to improve traffic circulation and accommodate increased queuing of vehicles.

Roadway improvements will also include new traffic signals, sidewalks and bike lanes.

Lead Partner: Caltrans